Monday, July 20, 2020

Launching in sunshine


Work done this time: small area of rot in the bottom plate of the bulwarks forward, timber replaced; one board in the bulwarks port side in way of wheelhouse door replaced; wheelhouse door rebuilt; rot in transom belting, timber replaced; all upper works prepared and painted; prop speed; metal stem band to protect stem and forefoot from flotsam damage; anti-fouling paint.