Wednesday, February 4, 2026
Tappets
Sunday, October 5, 2025
Friday, March 14, 2025
Anchor cable
The long awaited 80 metres of new 13mm anchor cable arrives from Michael Hill, Southshore Marine. Somewhat exciting. Michael's connection with Johnson's Barge meant we enjoyed some assistance from the skipper of the Manatu and his hydraulic arm.
![]() |
Alongside Johnson's Barge |
![]() |
Old cable comes out |
![]() |
New cable lifted onto the barge |
Saturday, December 7, 2024
Ventilation
Sunday, October 13, 2024
Chamber of horrors
June 21 the ferry Aratere went aground in Picton harbour due to a steering failure. Turned out it wasn't so much a mechanical failure as a procedural one, but it made me decide to do something about the corrosion in the steering flat on Orion. Life got in the way, and no action was actually taken until last week when Sue asked Gary and Giles (Aquaserv) to get on with the job.
The lazarette is poorly ventilated (which we are going to address next) and the damp conditions caused the hydraulic hose connectors to the steering arms to rust. Karl and Sam (FPS Havelock) found things not too bad, one hose however was "about to blow" and that is now an exhibit in the Chamber of Horrors. Some connectors were restored and some new ones supplied and this time they were coated. We didn't use Denzo tape because then you can't inspect them.
Sunday, October 31, 2021
Monograde 30
Thursday, November 1, 2018
Getting trolleyed
Fine day
Sunday, July 16, 2017
Three winter projects
Fuel transfer system
There was a tank balancing pipe that was quite useful, but it had a tendency to block with crud and water at its lowest point where it passes underneath the shaft. We started thinking that if we installed a pump and a filter and some change-over valves we could add some useful functionality: fuel transfer between tanks, only to having to use the filler nearest the fuel jetty, and trapping water and dirt. It just felt like it would offer more control than simple gravity balancing. It's a 14 litres/minute gear pump, and an off-the-shelf Ryco filter. Gregory Engineering of Picton made up the panel, and we fitted it over two weekends.
Aft deck cctv
Seeing out the back isn't too good, especially since we fitted the clears. We've installed a car reversing camera that looks out over the aft deck. The picture is really clear. It helps when we're backing out of the berth; it'll be handy when we're fishing; and it'll be good for keeping a lookout for traffic coming up from astern.
Higher dinghy chocks
When it rains the dinghy fills up. There's a perfectly good bung at the back with a mushroom valve. So we've built the forward chocks up to tilt the boat up at the bow. It helps when we're washing mud out of the bottom of the boat too.
Saturday, July 23, 2016
Winter projects
Friday, November 13, 2015
Creature comforts
Friday, July 3, 2015
Position of the blocks
It was pretty cold in the wind, and hard to find the necessary patience. But it's important to do this stuff, to be blocked well next time. Nick had some notes from when he hauled her last during Brian's time. Options in Marlborough include Tory Channel Contracting in Picton and Havelock Boatyard... both have good patent slipways. For the position of the blocks also see this page on this blog.
Caulking
Some of the butts needed attention because they'd got rather wide and stayed wet long after she was out. John refastened some of them using silicon bronze screws and was pleased to note they all pulled up tight. And some we put a tingle over as well, as in the picture below.










.png)